Busy Transport Logistics Facility
Project Overview
Jordan’s Surfacing Ltd was appointed to assess and repair the external asphalt surfaces at a busy transport logistics facility in Abercarn, South Wales. The area consisted of 5000m2 of asphalt surface.
The facility was experiencing extensive pavement deterioration caused by regular HGV movements, turning stresses, static loading and water ingress.
Following a detailed technical inspection, JSL
advised that the existing pavement had reached the end of its serviceable life and recommended full resurfacing as the most durable and cost-effective long-term solution.
The client did not wish to fund complete resurfacing at this stage. JSL therefore developed a targeted repair programme focused on the most severely deteriorated and operationally critical areas. The
completed scheme comprised 25 individual asphalt repairs covering approximately 400m2.

Our Professional Standards & Expertise
Technical Assessment and Options Report
JSL carried out a detailed inspection to establish the condition of the existing pavement and identify the most appropriate remedial options.
The assessment identified:
• Extensive cracking and potholing
• Rutting and surface deformation
• Fretting and loss of surface material
• Evidence of water ingress
• Weakness within the surface and supporting pavement layers
• Damage associated with regular HGV loading and turning movements
• Increased risk of vehicle damage, standing water and operational disruption
The inspection concluded that the pavement was no longer performing as a fully bound construction and that the observed defects were symptomatic of wider deterioration rather than isolated failures.
The yard was graded 4-5 on our surface conditioning scale.
JSL provided the client with clear technical advice explaining the condition of the yard, the available repair options and the likely limitations of localised patching.
Key Project Challenges:
The main challenges included:
Working within a live transport and logistics facility with continuous HGV movements
Maintaining safe vehicle access while individual repair areas were excavated and resurfaced
Prioritising the most critical defects within the client’s available budget
Repairing areas affected by cracking, potholes, rutting, fretting and deformation
Forming durable repair interfaces within an already weakened surrounding surface
Reducing the risk of water ingress and further deterioration at repair edges
Coordinating works around parked vehicles, loading activity and normal site operations

Recommended Solution
JSL recommended full resurfacing of the affected areas. A planned resurfacing programme would have provided the strongest long-term solution by restoring pavement integrity, improving safety and reducing future maintenance liability.
The client was advised that continued localised repair could not address the underlying deterioration and that repairs within a structurally weakened pavement may have a shorter service life than repairs undertaken within an otherwise sound surface.
The assessment also highlighted that delaying full resurfacing could allow further water ingress and deterioration, potentially increasing future reconstruction costs.

Budget-Led Repair Strategy
Although full resurfacing remained JSL’s technical recommendation, the client required a lower-cost intervention that could address the most urgent defects within the available budget.
JSL therefore developed a prioritised repair scheme targeting the areas presenting the greatest operational and safety concerns.
The selected approach allowed the client to:
• Address the most severe pavement defects
• Improve safety across key vehicle routes
• Reduce immediate risk to HGVs and site users
• Maintain operation of the logistics facility
Key Project Challenges
The main challenges included:
• Working within a live transport and logistics facility with continuous HGV movements
• Maintaining safe vehicle access while individual repair areas were excavated and resurfaced
• Prioritising the most critical defects within the client’s available budget
• Repairing areas affected by cracking, potholes, rutting, fretting and deformation
• Forming durable repair interfaces within an already weakened surrounding surface
• Reducing the risk of water ingress and further deterioration at repair edges
• Coordinating works around parked vehicles, loading activity and normal site operation
This provided a practical short- to medium-term solution while ensuring the client remained fully informed about the condition of the wider pavement.
Working in a Live Logistics Environment
The facility remained operational throughout the works, requiring careful coordination around HGV movements, loading activities, parked vehicles and normal business operations.
JSL planned and sequenced the repairs to maintain safe access wherever practicable and minimise disruption to the client.
Individual work areas were managed and completed in stages, allowing traffic to be redirected while maintaining continuity across the site.
Scope of Works
The repair programme included:
• Detailed pavement condition assessment
• Identification and prioritisation of critical defects
• Preparation of a technical report and repair recommendations
• Marking out of 25 individual repair areas
• Saw cutting and excavation of failed asphalt
• Removal of loose and structurally unsound material
• Preparation of repair edges and underlying layers
• Installation and compaction of replacement asphalt
• Formation of secure tie-ins to the surrounding pavement
• Management of HGV and operational access during the works
• Final inspection and site clean-down
The completed repairs covered approximately 400m2.
The Outcome
JSL successfully completed 25 targeted asphalt repairs across the live transport yard. The programme addressed the areas of greatest deterioration, improving safety, ride quality and usability along key HGV routes and operational areas.
By combining technical assessment with a prioritised repair strategy, JSL helped the client make an informed decision that balanced immediate operational needs with financial constraints.
The project also provided the client with a clear understanding of the wider pavement condition and the likely requirement for a future resurfacing programme.
Our Accreditations & Certifications



Project Benefits
Asphalt Repairs
25 targeted asphalt repairs
Consistent Surface
Approximately 400m2 of repaired pavement
Improved Vehicle Access
Improved safety across critical operational areas.
Reduced Risks
Reduced immediate risk of vehicle damage.
Clean Tie Ins
Improved surface condition along HGV routes.
Managed Workload
Works coordinated around a live logistics operation
Focussed Work
Prioritised investment based on technical need
Future Guidance
Clear advice regarding future resurfacing requirements
High Quality Solution
A practical solution aligned with the client’s current budget
Why The Project Matters
This project demonstrates JSL’s ability to provide clear, honest technical advice while responding practically to a client’s commercial constraints.
Although full resurfacing was identified as the most effective long-term solution, JSL worked with the client to develop a targeted repair programme that addressed the most urgent defects within the available budget.
The scheme required technical assessment, prioritisation, live-site planning and carefully sequenced repairs within a heavily used HGV environment.
It shows JSL’s ability to help clients understand pavement condition, compare repair and resurfacing options, and make informed decisions based on risk, performance and whole-life cost.
Our Excellent Client Reviews
Planning a Similar Resurfacing Project?
Whether you need targeted asphalt repairs or a full resurfacing scheme, Jordan’s Surfacing Ltd can assess your site, explain the available options and deliver a practical solution aligned with your budget, programme and operational needs.
We work across transport yards,logistics facilities and commercial sites to provide safe, durable and well-planned surfacing works with minimal disruption to your business.
Contact us to arrange a site visit and technical assessment.